Difference between revisions of "Super Site Tower"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
* wire trimmer | * wire trimmer | ||
* measuring tape | * measuring tape | ||
+ | |||
+ | ====Bolting hardware==== | ||
+ | * 9/16" Wrench & nut driver / socket | ||
+ | * tool belt, small | ||
+ | * | ||
===Extra Notes=== | ===Extra Notes=== | ||
Line 16: | Line 21: | ||
* it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS. | * it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS. | ||
* probably need an extension to reconnect the HMP power. | * probably need an extension to reconnect the HMP power. | ||
+ | |||
+ | |||
===Activity Log=== | ===Activity Log=== | ||
* 8/29 | * 8/29 | ||
Line 24: | Line 31: | ||
** re-routed at/rh | ** re-routed at/rh | ||
** hauled out bulk of tower clamps & related hardware | ** hauled out bulk of tower clamps & related hardware | ||
+ | * 9/18-9/28 | ||
+ | ** tracking down pipe & vehicles | ||
+ | ** fleshing out the procedure |
Revision as of 12:18, 28 September 2016
To Purchase in town etc
- 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips
- 4 x 8 x 8, 2 pcs for base
Tools needed
- small wire snipper
- flat head screw driver (medium sized)
- cable ties
- crimping tool
- wire trimmer
- measuring tape
Bolting hardware
- 9/16" Wrench & nut driver / socket
- tool belt, small
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
- something to keep an eye on. It coincided perhaps with an 8/21 visit.
- it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
- probably need an extension to reconnect the HMP power.
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
- powered off AT/RH
- the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
- 9/1
- re-routed at/rh
- hauled out bulk of tower clamps & related hardware
- 9/18-9/28
- tracking down pipe & vehicles
- fleshing out the procedure