Difference between revisions of "Super Site Tower"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
===Tools needed Thursday=== | ===Tools needed Thursday=== | ||
+ | * '''Lunch''' | ||
* wired Sawzall with long blade for cutting 8x8" lumber | * wired Sawzall with long blade for cutting 8x8" lumber | ||
* extra long sawzall blade | * extra long sawzall blade | ||
Line 9: | Line 10: | ||
* gorilla cart | * gorilla cart | ||
* cordless drill for hangers | * cordless drill for hangers | ||
+ | * 2 pcs uni-strut | ||
+ | * 8 pcs uni-strut clamps | ||
+ | * Wood Screws & washers to secure unistrut to trailer | ||
+ | * tie downs to secure pipe to trailer | ||
====Bolting hardware==== | ====Bolting hardware==== | ||
Line 14: | Line 19: | ||
* Type 316 Stainless Steel Nylon-Insert Locknut, 3/8"-16 Thread Size | * Type 316 Stainless Steel Nylon-Insert Locknut, 3/8"-16 Thread Size | ||
* Zinc Yellow-Chromate Plated Steel Flat Washer, Grade 9, 3/8" Screw Size | * Zinc Yellow-Chromate Plated Steel Flat Washer, Grade 9, 3/8" Screw Size | ||
+ | |||
+ | ===Thursday Plan=== | ||
+ | * Pick up vehicle at FS | ||
+ | ** load vehicle with all my other tools & equipment | ||
+ | ** toss in the key card for PFRR | ||
+ | * drive to north pole & White Spruce (before NP proper) | ||
+ | * Return to campus & load up trailer | ||
+ | ** screw uni-strut to trailer | ||
+ | ** secure rest of pipe to trailer | ||
+ | * drive to PFRR & unload pipe | ||
+ | * Move pipe & 16 of the 96 clamps to the shed area, probably in cart. | ||
+ | * move the four earth anchors from the vehicle to the shed area. | ||
+ | * bring the tools to the shed | ||
+ | * Cut the 8x8 timber to size using the sawzall | ||
+ | * place the timber on the ground supports | ||
+ | * put the bottom piece on the pipe. | ||
+ | * secure the first pipe at the bottom with the clamps & bolts/nuts/washers (2 per clamp) | ||
+ | * secure the first pipe at the top with the clamps & bolts/nuts/washers (2 per clamp) | ||
+ | * repeat for the other three pipes | ||
+ | |||
+ | ===Friday Plan=== | ||
+ | * secure any remaining pipes top & bottom | ||
+ | * Screw in the four earth anchors | ||
+ | * start securing in the remaining 10 clamps per leg. | ||
+ | * install on the shed the hooks for the top pulley deal | ||
+ | |||
+ | ===Plan for 1st week of October=== | ||
+ | * continue securing the clamps | ||
+ | |||
===Extra Notes=== | ===Extra Notes=== |
Revision as of 17:52, 28 September 2016
Contents
To Purchase in town etc
- after leg supports are in place will need to pick up lag bolts for anchor base mounts
Tools needed Thursday
- Lunch
- wired Sawzall with long blade for cutting 8x8" lumber
- extra long sawzall blade
- tool belt, small
- 9/16" Wrench & nut driver / socket
- gorilla cart
- cordless drill for hangers
- 2 pcs uni-strut
- 8 pcs uni-strut clamps
- Wood Screws & washers to secure unistrut to trailer
- tie downs to secure pipe to trailer
Bolting hardware
- Medium-Strength Grade 5 Zinc-Plated Steel Cap Screw, 3/8"-16 Thread, 4" Long
- Type 316 Stainless Steel Nylon-Insert Locknut, 3/8"-16 Thread Size
- Zinc Yellow-Chromate Plated Steel Flat Washer, Grade 9, 3/8" Screw Size
Thursday Plan
- Pick up vehicle at FS
- load vehicle with all my other tools & equipment
- toss in the key card for PFRR
- drive to north pole & White Spruce (before NP proper)
- Return to campus & load up trailer
- screw uni-strut to trailer
- secure rest of pipe to trailer
- drive to PFRR & unload pipe
- Move pipe & 16 of the 96 clamps to the shed area, probably in cart.
- move the four earth anchors from the vehicle to the shed area.
- bring the tools to the shed
- Cut the 8x8 timber to size using the sawzall
- place the timber on the ground supports
- put the bottom piece on the pipe.
- secure the first pipe at the bottom with the clamps & bolts/nuts/washers (2 per clamp)
- secure the first pipe at the top with the clamps & bolts/nuts/washers (2 per clamp)
- repeat for the other three pipes
Friday Plan
- secure any remaining pipes top & bottom
- Screw in the four earth anchors
- start securing in the remaining 10 clamps per leg.
- install on the shed the hooks for the top pulley deal
Plan for 1st week of October
- continue securing the clamps
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
- something to keep an eye on. It coincided perhaps with an 8/21 visit.
- it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
- probably need an extension to reconnect the HMP power.