Difference between revisions of "Barrow Oct 2016 trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 8: Line 8:
  
 
LPM install
 
LPM install
 +
*hoping I left the ubolts on and they shipped (bringing extra)
 +
*hose clamps that come with it
 +
*power cable
 +
*md485 cable
 +
 +
Enclosure
 
*electrical plugs
 
*electrical plugs
 
*md485
 
*md485
 
*md485 power plug
 
*md485 power plug
 +
*Cr1000
 +
*cr1000 power plug
 +
*ubolts for mounting enclosure
 +
 +
Other
 +
*butt splices
 +
*zip ties
 +
*putty
  
cr1000 power plug
 
  
  

Revision as of 17:14, 30 September 2016

3 SR50a's

  • 1* 10ft pipe
  • 4* 8ft pipe - get them cut at home depot
  • 2* threaded pipe 90 degree angle junctions
  • 6* rebar/screed stakes
  • 2 guy wires
  • mounts for all three sr50a's

LPM install

  • hoping I left the ubolts on and they shipped (bringing extra)
  • hose clamps that come with it
  • power cable
  • md485 cable

Enclosure

  • electrical plugs
  • md485
  • md485 power plug
  • Cr1000
  • cr1000 power plug
  • ubolts for mounting enclosure

Other

  • butt splices
  • zip ties
  • putty


Program


radios?? antennas? power? NL100


shipped to Barrow

  • 1* 10ft pipe
  • 4* 8ft pipe
  • 6* rebar/screed stakes
  • 100 ft roll conduit
  • LPM

shipped to Oliktok

  • Napa- aviation hydraulic oil- pour point minus 81 F
  • AIH - orange rebar caps
  • send up some ubolts