Difference between revisions of "Spring 2017 visit"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
*change notes in program where measure pressure to change CS100 to CS106 | *change notes in program where measure pressure to change CS100 to CS106 | ||
**remove sea level offset | **remove sea level offset | ||
+ | *get serial number for radios | ||
+ | *get height of terrestrial PAR |
Revision as of 17:31, 12 January 2017
- Check out the status of the heater wiring for CNR4
- is it even wired? to which ports?
- change the program notes if wired
- change program controls for heater
- bring up couple SW12V
- stabilize underwater par sensor with second string for cleaning
- add terrestrial quantum to sensor wiring notes at top of program
- check what the calconnector looks like for lake PAR.
- maybe need to buy a second one so can coordinate with calibration swaps
- its reading negative because the sensor head was swapped wrong, but this isn't an issue.
- change notes in program where measure pressure to change CS100 to CS106
- remove sea level offset
- get serial number for radios
- get height of terrestrial PAR