Difference between revisions of "Spring 2017 visit"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 18: Line 18:
 
*install BF5 sensor
 
*install BF5 sensor
 
** tripod is 9ft7in from tower. cable is 5m. so this ''should'' work out
 
** tripod is 9ft7in from tower. cable is 5m. so this ''should'' work out
 +
**bring some spare AC power line, inverters and plugs to set up power for heater.
 +
*set up evap pan
 +
*organize the enclosure
 +
**zip ties of many colors and sizes
 +
**wires of many colors (mostly red and black)
 +
**white wire connector things

Revision as of 15:38, 18 May 2017

  • Check out the status of the heater wiring for CNR4
    • is it even wired? to which ports?
    • change the program notes if wired
    • change program controls for heater
    • bring up couple SW12V
  • change desiccant in CNR4
  • stabilize underwater par sensor with second string for cleaning
  • add terrestrial quantum to sensor wiring notes at top of program
  • check what the calconnector looks like for lake PAR.
    • maybe need to buy a second one so can coordinate with calibration swaps
    • its reading negative because the sensor head was swapped wrong, but this isn't an issue.
  • change notes in program where measure pressure to change CS100 to CS106
    • remove sea level offset
  • get serial number for radios
  • get height of terrestrial PAR
  • check if pluvio is pointing north
  • think about soil temps- at least find them
  • install BF5 sensor
    • tripod is 9ft7in from tower. cable is 5m. so this should work out
    • bring some spare AC power line, inverters and plugs to set up power for heater.
  • set up evap pan
  • organize the enclosure
    • zip ties of many colors and sizes
    • wires of many colors (mostly red and black)
    • white wire connector things