Difference between revisions of "Spring 2017 visit"
Jump to navigation
Jump to search
Line 18: | Line 18: | ||
*install BF5 sensor | *install BF5 sensor | ||
** tripod is 9ft7in from tower. cable is 5m. so this ''should'' work out | ** tripod is 9ft7in from tower. cable is 5m. so this ''should'' work out | ||
+ | **bring some spare AC power line, inverters and plugs to set up power for heater. | ||
+ | *set up evap pan | ||
+ | *organize the enclosure | ||
+ | **zip ties of many colors and sizes | ||
+ | **wires of many colors (mostly red and black) | ||
+ | **white wire connector things |
Revision as of 15:38, 18 May 2017
- Check out the status of the heater wiring for CNR4
- is it even wired? to which ports?
- change the program notes if wired
- change program controls for heater
- bring up couple SW12V
- change desiccant in CNR4
- stabilize underwater par sensor with second string for cleaning
- add terrestrial quantum to sensor wiring notes at top of program
- check what the calconnector looks like for lake PAR.
- maybe need to buy a second one so can coordinate with calibration swaps
- its reading negative because the sensor head was swapped wrong, but this isn't an issue.
- change notes in program where measure pressure to change CS100 to CS106
- remove sea level offset
- get serial number for radios
- get height of terrestrial PAR
- check if pluvio is pointing north
- think about soil temps- at least find them
- install BF5 sensor
- tripod is 9ft7in from tower. cable is 5m. so this should work out
- bring some spare AC power line, inverters and plugs to set up power for heater.
- set up evap pan
- organize the enclosure
- zip ties of many colors and sizes
- wires of many colors (mostly red and black)
- white wire connector things