Difference between revisions of "2017 NGEE Nome October trip"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
===Loose Itinerary=== | ===Loose Itinerary=== | ||
− | * 9/29 | + | * 9/29 (8:18 - 9:36 Twilight to twilight) |
** evening: arrive & stay in apartments | ** evening: arrive & stay in apartments | ||
− | * 9/30 | + | * 9/30 (8:21 - 9:19) |
− | * | + | ** evening: Lily arrives |
− | ** | + | ** stay in hotel |
− | ** walk the end point of the lines set up in March 2017 and | + | * 10/1 (8:24 - 9:16) |
− | * 10/ | + | * Teller |
+ | ** walk the end point of the lines set up in March 2017 and remove the orange poles | ||
+ | |||
+ | * 10/2 (8:27 - 9:12) | ||
** Teller button up for winter, snow pole remainder | ** Teller button up for winter, snow pole remainder | ||
** remove one PT at the bottom site | ** remove one PT at the bottom site | ||
− | * 10/ | + | * 10/3 (8:30 - 9:09) |
** drive to kougarok. download data over radios from K sites | ** drive to kougarok. download data over radios from K sites | ||
** stretch goal... visit k2 if time for thaw depth measurements | ** stretch goal... visit k2 if time for thaw depth measurements | ||
− | * 10/ | + | * 10/4 (8:33 - 9:05) |
** kougarok m64 winter button up | ** kougarok m64 winter button up | ||
− | ** soil pit | + | ** ??? soil pit ??? |
− | ** kougarok m64 finish surveying | + | ** kougarok m64 finish surveying & deploy snow poles |
− | * 10/ | + | * 10/5 (8:36 - 9:02) |
* Council | * Council | ||
** survey 2017 plots? | ** survey 2017 plots? | ||
** download data | ** download data | ||
** visit C2? | ** visit C2? | ||
− | * 10/ | + | * 10/6 depart |
Revision as of 16:09, 8 September 2017
Activities:
- teller top:
- double-check data
- thermal conductivity probes working?
- maybe replace cnr4
- teller bottom
- sr50a transducer replacement, 2x
- remove 1 PT
- discharge measurement
- Kougarok m64
- bring guy wire markers for K64 met station (at uaf storage)
Loose Itinerary
- 9/29 (8:18 - 9:36 Twilight to twilight)
- evening: arrive & stay in apartments
- 9/30 (8:21 - 9:19)
- evening: Lily arrives
- stay in hotel
- 10/1 (8:24 - 9:16)
- Teller
- walk the end point of the lines set up in March 2017 and remove the orange poles
- 10/2 (8:27 - 9:12)
- Teller button up for winter, snow pole remainder
- remove one PT at the bottom site
- 10/3 (8:30 - 9:09)
- drive to kougarok. download data over radios from K sites
- stretch goal... visit k2 if time for thaw depth measurements
- 10/4 (8:33 - 9:05)
- kougarok m64 winter button up
- ??? soil pit ???
- kougarok m64 finish surveying & deploy snow poles
- 10/5 (8:36 - 9:02)
- Council
- survey 2017 plots?
- download data
- visit C2?
- 10/6 depart