Difference between revisions of "2017 NGEE Nome October trip"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 2: | Line 2: | ||
** 9/29 - 10/6  | ** 9/29 - 10/6  | ||
*Nugget reservation 1346  | *Nugget reservation 1346  | ||
| + | |||
===Activities:===  | ===Activities:===  | ||
| Line 42: | Line 43: | ||
** download C2 blueberry data over radio  | ** download C2 blueberry data over radio  | ||
** push snow off eddy system.  | ** push snow off eddy system.  | ||
| + | |||
| + | ===Sensor Issues===  | ||
| + | Data Notes  | ||
| + | * Double-check thermistor equations  | ||
| + | * double-check precision resistor values.  | ||
| + | * think about bringing car adapter plus aligator clips etc out so we can tie into station batteries during program compilation.  | ||
| + | |||
| + | Teller Bottom Soil:  | ||
| + | * teller bottom: confirm that thermistor values as-built match resistor in field.  | ||
| + | * Soil Moisture #5... is it connected?  | ||
| + | * Heat Flux Plates are doing the wrong thing... are they measured right?  | ||
| + | * thermal conductivity thermistors... it kind of looks like the measurement is still settling.  The measurement is quite spikey from time to time.  | ||
| + | * Looks like VATP3 shifted on 4/21.  | ||
| + | * same for VATP4  | ||
| + | * same for VATP  6  | ||
| + | * same for vatp 8  | ||
| + | * same for vatp 9  | ||
| + | * can see water pulse around 4/21 in the lower thermistors.  | ||
| + | |||
| + | Teller Bottom Spectral:  | ||
| + | * Decagon Sensors look good  | ||
| + | |||
| + | Teller Bottom Radiation:  | ||
| + | * Looks good just need to correct albedo for nighttime.  | ||
| + | |||
| + | Teller Bottom Snow Temp Profile:  | ||
| + | * Looks pretty good  | ||
| + | |||
| + | Teller Bottom Thermal Conductivity:  | ||
| + | * data is spikey, in soil pit temperatures  | ||
| + | |||
| + | Teller Top Met  | ||
| + | * HMP155 is still broken.  | ||
| + | * All other sensors look good.   | ||
| + | |||
| + | Teller Top Soil:  | ||
| + | * I'm suspicious that the precision resistor values for teller top aren't correct.  | ||
| + | * vatp4 freezing point is at 2 deg C  | ||
| + | * I think there was quite a bit of water running down the probe during snowmelt.  | ||
| + | |||
| + | Teller Top Thermal Conductivity:  | ||
| + | * something funky going on here, too, as in precision resistor may be off and also the data is quite spikey.  | ||
| + | |||
| + | Kougarok Mile 64 Met  | ||
| + | * skin temperature looks like there is a loose wire  | ||
| + | * Other sensors look good.  | ||
| + | |||
| + | Kougarok Mile 64 Spectral  | ||
| + | * all sensors look good  | ||
| + | |||
| + | Kougarok Mile 64 Soil  | ||
===Loose Itinerary===  | ===Loose Itinerary===  | ||
Revision as of 09:37, 28 September 2017
- Car Rental Reservation: R41747
- 9/29 - 10/6
 
 - Nugget reservation 1346
 
Activities:
- Nome
- find new base station location with Chad
 - return GCI cable modem from Boxer Apartments
 
 - teller
- move snow poles to TLA line
 - put one snow pole in each actual snow course center of X for the IS crosses.
 - remove remaining poles
 
 - teller bottom:
- check soil moisture #5 (bottom) seems to be not powered / connected.
 
 - teller top:
- double-check data
 - thermal conductivity probes working?
 - maybe replace cnr4
- and or drill out stripped screws
 
 
 - replace memory card in camera
 - teller bottom
 - replace memory card in camera
- sr50a transducer replacement, 2x
 - remove 1 PT
 - discharge measurement
 
 - Kougarok m64
- bring guy wire markers for K64 met station (at uaf storage)
 - setup snow grid for spring (surveying)
- 9/25 waiting on geopdf & shape files from Lauren for this.
 
 - survey the remaining intensive sites out there:
- IS5, IS6, IS8
 
 - soil pit.............
 - altar shield
- need 2 2x4 chunks for base
 - need 2 more pieces of functional altar shield
 - need wood screws to screw vertical pipes to base.
 
 
 - Original Kougarok:
- download data by radio
 
 - Council
- fix program at C1 Grid
 - download C2 blueberry data over radio
 - push snow off eddy system.
 
 
Sensor Issues
Data Notes
- Double-check thermistor equations
 - double-check precision resistor values.
 - think about bringing car adapter plus aligator clips etc out so we can tie into station batteries during program compilation.
 
Teller Bottom Soil:
- teller bottom: confirm that thermistor values as-built match resistor in field.
 - Soil Moisture #5... is it connected?
 - Heat Flux Plates are doing the wrong thing... are they measured right?
 - thermal conductivity thermistors... it kind of looks like the measurement is still settling. The measurement is quite spikey from time to time.
 - Looks like VATP3 shifted on 4/21.
 - same for VATP4
 - same for VATP 6
 - same for vatp 8
 - same for vatp 9
 - can see water pulse around 4/21 in the lower thermistors.
 
Teller Bottom Spectral:
- Decagon Sensors look good
 
Teller Bottom Radiation:
- Looks good just need to correct albedo for nighttime.
 
Teller Bottom Snow Temp Profile:
- Looks pretty good
 
Teller Bottom Thermal Conductivity:
- data is spikey, in soil pit temperatures
 
Teller Top Met
- HMP155 is still broken.
 - All other sensors look good.
 
Teller Top Soil:
- I'm suspicious that the precision resistor values for teller top aren't correct.
 - vatp4 freezing point is at 2 deg C
 - I think there was quite a bit of water running down the probe during snowmelt.
 
Teller Top Thermal Conductivity:
- something funky going on here, too, as in precision resistor may be off and also the data is quite spikey.
 
Kougarok Mile 64 Met
- skin temperature looks like there is a loose wire
 - Other sensors look good.
 
Kougarok Mile 64 Spectral
- all sensors look good
 
Kougarok Mile 64 Soil
Loose Itinerary
- 9/29 (8:18 - 9:36 Twilight to twilight)
- evening: arrive & stay in apartments
 
 - 9/30 (8:21 - 9:19)
- take some storage stuff to dump
 - evening: Lily arrives
 - stay in hotel
 
 - 10/1 (8:24 - 9:16)
 - Teller
- walk the end point of the lines set up in March 2017 and remove the orange poles
 - place 4 poles at bottom to help outline location of channel for PTs
 
 - 10/2 (8:27 - 9:12)
- Teller Top:
- change desiccant which will require:
- drill
 - drill bit
 - tap & die
 - replacement machine screws for stripped out ones.
 
 
 - change desiccant which will require:
 - Teller button up for winter, snow pole remainder
 - remove one PT at the bottom site
 
 - Teller Top:
 - 10/3  (8:30 - 9:09)
- drive to kougarok. download data over radios from K sites
 - stretch goal... visit k2 if time for thaw depth measurements
 
 - 10/4 (8:33 - 9:05)
- kougarok m64 winter button up
 - ??? soil pit ???
 - kougarok m64 finish surveying & deploy snow poles
 
 - 10/5 (8:36 - 9:02)
 - Council
- survey 2017 plots?
 - download data over radio for C2 (at minimum)
 - visit C2?
 - fix program at C1
 
 - 10/6 depart