Difference between revisions of "SS To Do Next Visit"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
** I need to confirm that this unit is the correct one.  The one I took a picture of operates at 110VAC but I think some of the others operate at a lower voltage.
 
** I need to confirm that this unit is the correct one.  The one I took a picture of operates at 110VAC but I think some of the others operate at a lower voltage.
 
* Deploy sensor refresh instruments from March.
 
* Deploy sensor refresh instruments from March.
 +
** brought out 4pcs anemometers
 
* Buy a new HMP155 for forest floor site
 
* Buy a new HMP155 for forest floor site
 
* More PAR sensors and hardware for in-situ
 
* More PAR sensors and hardware for in-situ
Line 18: Line 19:
 
* Late Fall recalibrations:
 
* Late Fall recalibrations:
 
** LI7200RS
 
** LI7200RS
* Upgrade the smart flux 2 firmware on the tower
+
* XX Upgrade the smart flux 2 firmware on the tower
 +
** figure out how to update smartflux eddypro settings
 
* Reset the tower all sky camera
 
* Reset the tower all sky camera

Revision as of 15:03, 22 May 2018

2018

  • Replace tower aspirator fans:
  • Deploy sensor refresh instruments from March.
    • brought out 4pcs anemometers
  • Buy a new HMP155 for forest floor site
  • More PAR sensors and hardware for in-situ
  • Buy another SI-111 SDI12 model
  • Attend LI-COR training?
  • Polish Battery Backup System
  • replace Loggernet computer
  • The tower wifi antenna needs replacing. Do this next visit. The coax is weathered and fraying.
  • Submit PRs for Summer 2018 Instrument Recalibrations
    • Vaisala HMP155s
    • MetOne 010C
    • Kipp & Zonen CNR4
  • Late Fall recalibrations:
    • LI7200RS
  • XX Upgrade the smart flux 2 firmware on the tower
    • figure out how to update smartflux eddypro settings
  • Reset the tower all sky camera