Difference between revisions of "SS To Do Next Visit"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
** figure out how to update smartflux eddypro settings | ** figure out how to update smartflux eddypro settings | ||
* look at longwave data from CNR4 because there is an issue of some sort. | * look at longwave data from CNR4 because there is an issue of some sort. | ||
+ | * SS Heat FLux is off? Check power in the remote enclosure |
Revision as of 14:34, 25 June 2018
2018
- Replace tower aspirator fans:
- https://catalog.orientalmotor.com/viewitems/mb-series-ac-centrifugal-fans-blowers/mb-series-50mm-centrifugal-fans-blowers
- I need to confirm that this unit is the correct one. The one I took a picture of operates at 110VAC but I think some of the others operate at a lower voltage.
- Deploy sensor refresh instruments from March.
- brought out 4pcs anemometers
- Buy a new HMP155 for forest floor site
- More PAR sensors and hardware for in-situ
- Buy another SI-111 SDI12 model
- Attend LI-COR training?
- Polish Battery Backup System
- replace Loggernet computer
- The tower wifi antenna needs replacing. Do this next visit. The coax is weathered and fraying.
- Submit PRs for Summer 2018 Instrument Recalibrations
- Vaisala HMP155s
- MetOne 010C
- Kipp & Zonen CNR4
- Late Fall recalibrations:
- LI7200RS
- XX Upgrade the smart flux 2 firmware on the tower
- figure out how to update smartflux eddypro settings
- look at longwave data from CNR4 because there is an issue of some sort.
- SS Heat FLux is off? Check power in the remote enclosure