Line 13: Line 13:
 
** Kipp & Zonen CNR4  
 
** Kipp & Zonen CNR4  
 
* Late Fall recalibrations:
 
* Late Fall recalibrations:
 +
** LI-7200s
 
Ss soil has room on c7 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.
 
Ss soil has room on c7 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.
 +
* need to extend the SI-421 I've located and then it is ready to deploy at forest floor radiation tower
 +
** will need to set SDI12 ID
 +
 
Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.
 
Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.
 
* Replace SR50A transducers
 
* Replace SR50A transducers
Line 24: Line 28:
 
* buy and add more PAR top and bottom (4x and matching hardware)
 
* buy and add more PAR top and bottom (4x and matching hardware)
 
* add another tipping bucket.
 
* add another tipping bucket.
 +
 +
 +
===Nearly end of summer status====
 +
* Get a handle on remaining budget
 +
* re-calibrate as many sensors as able
 +
* buy a couple more sensors as able
 +
* licor training if possible
 +
* write program for new soil pit box
 +
** soil moisture at 2+ depths
 +
** soil temp

Revision as of 17:12, 1 August 2018

2018

Ss soil has room on c7 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.

  • need to extend the SI-421 I've located and then it is ready to deploy at forest floor radiation tower
    • will need to set SDI12 ID

Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.

  • Replace SR50A transducers
  • Dig second pit for soil instruments
  • clean up outdoor power cords
  • waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
  • I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
  • connect those shop power strips and get one more for inside?
  • SI111 install
  • buy and add more PAR top and bottom (4x and matching hardware)
  • add another tipping bucket.


Nearly end of summer status=

  • Get a handle on remaining budget
  • re-calibrate as many sensors as able
  • buy a couple more sensors as able
  • licor training if possible
  • write program for new soil pit box
    • soil moisture at 2+ depths
    • soil temp