Difference between revisions of "SS To Do Next Visit"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 28: Line 28:
 
* buy and add more PAR top and bottom (4x and matching hardware)
 
* buy and add more PAR top and bottom (4x and matching hardware)
 
* add another tipping bucket.
 
* add another tipping bucket.
 
+
* panorama from tower for identifying horizon landmarks
 +
* bring solder out for ff atrh and electrical goo
  
 
===Nearly end of summer status====
 
===Nearly end of summer status====

Revision as of 18:22, 8 August 2018

2018

Ss soil has room on c7 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.

  • need to extend the SI-421 I've located and then it is ready to deploy at forest floor radiation tower
    • will need to set SDI12 ID

Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.

  • Replace SR50A transducers
  • Dig second pit for soil instruments
  • clean up outdoor power cords
  • waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
  • I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
  • connect those shop power strips and get one more for inside?
  • SI111 install
  • buy and add more PAR top and bottom (4x and matching hardware)
  • add another tipping bucket.
  • panorama from tower for identifying horizon landmarks
  • bring solder out for ff atrh and electrical goo

Nearly end of summer status=

  • Get a handle on remaining budget
  • re-calibrate as many sensors as able
  • buy a couple more sensors as able
  • licor training if possible
  • write program for new soil pit box
    • soil moisture at 2+ depths
    • soil temp