Difference between revisions of "Dbm6"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
== 03 Sept 2007, Ken I. == | == 03 Sept 2007, Ken I. == | ||
− | + | Transcribed EKY | |
* downloaded data, saved old program, updated new program | * downloaded data, saved old program, updated new program | ||
* site looks good | * site looks good | ||
* antennae radio pole vertical but the guys are loose, need to reset | * antennae radio pole vertical but the guys are loose, need to reset | ||
+ | |||
+ | == 29 Aug 2007, Ken I == | ||
+ | Transcribed EKY | ||
+ | * Tripod looks good | ||
+ | * Precip good | ||
+ | * Radiation pole, 1 guy detached | ||
+ | **reset radiation pole turn buckles and wired them to secure | ||
+ | * Net rad is level, 111 cm to ground from sensor, but grass is 10 cm higher, birch (?) to 15 cm higher | ||
+ | * SR50 is 148 cm to ground | ||
+ | * Rotated SR50 pole to secure to guy wire via tie wrap |
Revision as of 10:58, 6 June 2008
TODO
Measure distance from ground to SR50 sensor
site logs
03 Sept 2007, Ken I.
Transcribed EKY
- downloaded data, saved old program, updated new program
- site looks good
- antennae radio pole vertical but the guys are loose, need to reset
29 Aug 2007, Ken I
Transcribed EKY
- Tripod looks good
- Precip good
- Radiation pole, 1 guy detached
- reset radiation pole turn buckles and wired them to secure
- Net rad is level, 111 cm to ground from sensor, but grass is 10 cm higher, birch (?) to 15 cm higher
- SR50 is 148 cm to ground
- Rotated SR50 pole to secure to guy wire via tie wrap