Difference between revisions of "Toolik-Snow"
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
== 10 Sept 2008, Emily and Ken == | == 10 Sept 2008, Emily and Ken == | ||
Site established on Sept 11, 2008 | Site established on Sept 11, 2008 | ||
+ | |||
Installed two SR50s | Installed two SR50s | ||
*SR50E (E indicates East) sensor has '''bark chips''' and trimmed vegetation under sensor | *SR50E (E indicates East) sensor has '''bark chips''' and trimmed vegetation under sensor |
Revision as of 13:09, 17 September 2008
Toolik Snow and Precipitation Test Site (Snownet)
site logs
10 Sept 2008, Emily and Ken
Site established on Sept 11, 2008
Installed two SR50s
- SR50E (E indicates East) sensor has bark chips and trimmed vegetation under sensor
- Sensor has NO orange tape on the end of the grey cable
- S/N C4802 installed 9/10/08
- Measured SR50 distance to the ground is 160, n163, 163, 160, 160, 159 cm average = 161
- SR50W (W indicates West) sensor has no bark chips, no trimmed vegetation, natural conditions, control
- Sensor has orange tape at the end of the grey cable (into the instrument shelter) indicating it is the control
- S/N C5011 installed 9/10/08
- Measured SR50 distance to ground 180, 175, 176, 174, 178, avg 176.6
- Surface is unlevel, grass is 24 to 40 cm tall.
RM Young installed
- S/N
GWS YSIx3 thermistor
- needs housing, currently under instrument shelter box
HMP45C cable onsite
- Needs sensor
- Needs housing
Barometric Pressure
- needs rewiring?
Solar panel installed on 2 fenceposts