Field Plans
- First day on site set up tag line for surface water discharge measurements
- Snow survey at ___ points across the watershed (still deciding)
- survey water surface daily
- measure discharge once there is measurable flow in the creek
- build bridge across creek
- look for Bob's camera
- water quality sampling
- gps positiong
- note time of day & date
Safety Gear
- life jackets
- throw bag?
Field Gear
- make a bridge from unistrut for creek access
- 6 or 9 5' pieces of unistrut plus wooden planks, bolt together using strut nuts
- velocity probe
- Sontek
- Flo-Mate
- wading rod
- waders
- dry suit
- survey tripod
- total station for stage readings?
- need a taller rod for the prism
- or, track down optical level.
Day 1
- take out bridge and related supplies
- bring out survey tripod
- start water quality sampling & discharge measurements after setting up bridge
- if there is still snow at the valley bottom, consider adding additional cameras to the tripods.
Day 2
- depending on how day one goes.. maybe drop off towards top of basin. Hike down to road measuring snow depth with an avalanche probe
- at the bottom, finish day by measuring discharge in the creek
Stuff i moved to NGEE conex
- survey poles
- yellow dry survival bag
- drill case & batteries & bit
- staff gauges
- blue cushion
- snow laser poles
- thaw probe
- Larry chair
- skis
- rebar protection (i should make a metal tag that says remove this protection before surveying)
- avalanche probe
- both light shovels
- 2 boxes for HMP155 & foam for CNR4 & empty box for SR50A
- hammer
- ubolt & misc bailing wire
- emergency pot
- tripods for cameras