NGEE Barrow August 2016
Revision as of 13:15, 22 July 2016 by 137.229.92.213 (talk)
I'm starting this for the Bill & Lily trip.
To Do:
- Could you roll up the extension cord running from the eddy covariance tower to Sina's thermal IR tower location? Take back to storage?
- We should ask Stan / Brian if it is still out there
- brin
September Items that would be bonus for August
I have these items on the September trip but if you have time it would be awesome to do them in August and even better if we don't need the September trip: To Do:
- Replace all SR50A snow transducers
- 2pcs @ A, 2 pcs @ B, 3pcs @ C, 1pcs @ D
- tools required:
- phillips screw driver
- 1/4" nutdriver if you remove the sensor from the stand to swap out.
- 1/2" wrench/nut driver if you remove the sensor.
- Also, check
- Swap out all Wind Speed Sensors
- 3m @ A, B, C will require a ladder
- 1.2m @ A,B, C, D
- These are Met One 014A sensors so the tricky part I think will be the corrosion. The sensor cable screws on the base which I think won't be too bad but might require a channel lock.
- The cups though will require an allen wrench, small, and the corrosion may make removing them all but impossible. I'm not sure.
- we'll need to add anti corrosion goo to the fittings on replacement, too.
- check level on radiometers
To Bring:
- 014A replacements
- couple small tools
- 1/2" wrench/nut driver
- 1/4" wrench/nutdriver
- metric allen wrenches
- ladder
- SR50A transducers