Dfr1
Revision as of 21:04, 10 July 2007 by imported>Ken
Contents
Kakukturat Mountain Repeater
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
- take (repeater) wiring diagram to site to leave (tape) inside instrument box
- replace HMP45C sensor
site logs
9 June 2007, Ken I., Dan R.
- installed electric fence with 3 posts
- antenna cable was found pulled out of connector inside instrument enclosure; replaced connector
- tested radio connection (OK) to DFM1 & DFR2; connected to logger through radio (OK)
- installed 3-thermister AT sensor
- site needs wiring diagram