2017 NGEE Nome October trip

From IARC 207 Wiki
Revision as of 09:37, 28 September 2017 by 137.229.29.107 (talk)
Jump to navigation Jump to search
  • Car Rental Reservation: R41747
    • 9/29 - 10/6
  • Nugget reservation 1346


Activities:

  • Nome
    • find new base station location with Chad
    • return GCI cable modem from Boxer Apartments
  • teller
    • move snow poles to TLA line
    • put one snow pole in each actual snow course center of X for the IS crosses.
    • remove remaining poles
  • teller bottom:
    • check soil moisture #5 (bottom) seems to be not powered / connected.
  • teller top:
    • double-check data
    • thermal conductivity probes working?
    • maybe replace cnr4
      • and or drill out stripped screws
  • replace memory card in camera
  • teller bottom
  • replace memory card in camera
    • sr50a transducer replacement, 2x
    • remove 1 PT
    • discharge measurement
  • Kougarok m64
    • bring guy wire markers for K64 met station (at uaf storage)
    • setup snow grid for spring (surveying)
      • 9/25 waiting on geopdf & shape files from Lauren for this.
    • survey the remaining intensive sites out there:
      • IS5, IS6, IS8
    • soil pit.............
    • altar shield
      • need 2 2x4 chunks for base
      • need 2 more pieces of functional altar shield
      • need wood screws to screw vertical pipes to base.
  • Original Kougarok:
    • download data by radio
  • Council
    • fix program at C1 Grid
    • download C2 blueberry data over radio
    • push snow off eddy system.

Sensor Issues

Data Notes

  • Double-check thermistor equations
  • double-check precision resistor values.
  • think about bringing car adapter plus aligator clips etc out so we can tie into station batteries during program compilation.

Teller Bottom Soil:

  • teller bottom: confirm that thermistor values as-built match resistor in field.
  • Soil Moisture #5... is it connected?
  • Heat Flux Plates are doing the wrong thing... are they measured right?
  • thermal conductivity thermistors... it kind of looks like the measurement is still settling. The measurement is quite spikey from time to time.
  • Looks like VATP3 shifted on 4/21.
  • same for VATP4
  • same for VATP 6
  • same for vatp 8
  • same for vatp 9
  • can see water pulse around 4/21 in the lower thermistors.

Teller Bottom Spectral:

  • Decagon Sensors look good

Teller Bottom Radiation:

  • Looks good just need to correct albedo for nighttime.

Teller Bottom Snow Temp Profile:

  • Looks pretty good

Teller Bottom Thermal Conductivity:

  • data is spikey, in soil pit temperatures

Teller Top Met

  • HMP155 is still broken.
  • All other sensors look good.

Teller Top Soil:

  • I'm suspicious that the precision resistor values for teller top aren't correct.
  • vatp4 freezing point is at 2 deg C
  • I think there was quite a bit of water running down the probe during snowmelt.

Teller Top Thermal Conductivity:

  • something funky going on here, too, as in precision resistor may be off and also the data is quite spikey.

Kougarok Mile 64 Met

  • skin temperature looks like there is a loose wire
  • Other sensors look good.

Kougarok Mile 64 Spectral

  • all sensors look good

Kougarok Mile 64 Soil

Loose Itinerary

  • 9/29 (8:18 - 9:36 Twilight to twilight)
    • evening: arrive & stay in apartments
  • 9/30 (8:21 - 9:19)
    • take some storage stuff to dump
    • evening: Lily arrives
    • stay in hotel
  • 10/1 (8:24 - 9:16)
  • Teller
    • walk the end point of the lines set up in March 2017 and remove the orange poles
    • place 4 poles at bottom to help outline location of channel for PTs
  • 10/2 (8:27 - 9:12)
    • Teller Top:
      • change desiccant which will require:
        • drill
        • drill bit
        • tap & die
        • replacement machine screws for stripped out ones.
    • Teller button up for winter, snow pole remainder
    • remove one PT at the bottom site
  • 10/3 (8:30 - 9:09)
    • drive to kougarok. download data over radios from K sites
    • stretch goal... visit k2 if time for thaw depth measurements
  • 10/4 (8:33 - 9:05)
    • kougarok m64 winter button up
    •  ??? soil pit ???
    • kougarok m64 finish surveying & deploy snow poles
  • 10/5 (8:36 - 9:02)
  • Council
    • survey 2017 plots?
    • download data over radio for C2 (at minimum)
    • visit C2?
    • fix program at C1
  • 10/6 depart