Dbm7

From IARC 207 Wiki
Revision as of 11:41, 6 June 2008 by 137.229.77.32 (talk)
Jump to navigation Jump to search

Lower Kadleroshilik River met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed
  • Site needs new SR50 (spring 2008)
  • measure distance from ground to SR50

site logs

== 14 June 2007, Ken I., Doug K.

  • brief stop at site; notes made in field book the next day
  • tripod look OK on quick look
  • radiation pole leaning
    • one guy anchor (north) pulled
    • another guy turnbuckle was apart -- presumably unscrewed by wind/vibration
  • adjusted 3rd (cast alumninum) turnbuckle to show some threads -- was at end of bolt
  • drove 18-inch rebar at north anchor
    • reset turnbuckle on SW guy
  • rad pole firmly frozen/set in ground
    • pushed (bent) pole to near-plumb
  • radiometer mount failed with 2 lower ears bent, one cracked
    • reset mount to level radiometer
    • presume bear caused this damage
  • snow depth height: 119 cm
  • radiometer height: 119 cm