SS To Do Next Visit
2018
- More PAR sensors and hardware for in-situ
- Buy another SI-111 SDI12 model
- Attend LI-COR training?
- Polish Battery Backup System
- replace Loggernet computer
- bring out an NL100 or USB to serial adapter
- Submit PRs for Summer 2018 Instrument Recalibrations
- Vaisala HMP155s
- MetOne 010C
- Kipp & Zonen CNR4
- Late Fall recalibrations:
- LI-7200s
Ss soil has room on c7 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.
- need to extend the SI-421 I've located and then it is ready to deploy at forest floor radiation tower
- will need to set SDI12 ID
Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.
- Replace SR50A transducers
- Dig second pit for soil instruments
- clean up outdoor power cords
- waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
- I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
- connect those shop power strips and get one more for inside?
- SI111 install
- buy and add more PAR top and bottom (4x and matching hardware)
- add another tipping bucket.
- panorama from tower for identifying horizon landmarks
- bring solder out for ff atrh and electrical goo
Nearly end of summer status=
- Get a handle on remaining budget
- re-calibrate as many sensors as able
- buy a couple more sensors as able
- licor training if possible
- write program for new soil pit box
- soil moisture at 2+ depths
- soil temp