2018

Fall List

  • Might add a SR50A to the soil pit
  • might add a SI111 to the soil pit
  • might add a UPS for the heat flux logger system in case there are power problems
    • the network switch connecting the toughbook to the LI7200 and the LI7200 to the fluxprocessor
  • Need to find out OS version of tower wind master pro
  • need to remove battery from sky cam laptop
  • bring out NL100/200.

Summer List

Ss soil has room on c5 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.

  • SDI12 ID 8 = Shed
  • SDI12 ID 9 = Forest Floor Radiation Stand

Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.

  • Replace SR50A transducers
  • Dig second pit for soil instruments
  • clean up outdoor power cords
  • waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
  • I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
  • connect those shop power strips and get one more for inside?
  • buy and add more PAR top and bottom (4x and matching hardware)
  • add another tipping bucket.
  • bring solder out for ff atrh blower and electrical goo

Nearly end of summer status=

  • Get a handle on remaining budget
  • re-calibrate as many sensors as able
  • buy a couple more sensors as able
  • licor training if possible
  • write program for new soil pit box
    • soil moisture at 2+ depths
    • soil temp