NGEE Teller Bottom Notes

From IARC 207 Wiki
Revision as of 09:31, 27 August 2018 by 10.25.167.103 (talk) (→‎Soil)
Jump to navigation Jump to search

Latest

  • Met Data QA'd through: 6/15/2018
  • Radiation Data QA'd through: 6/15/2018
  • Soil through:
  • Snow profile through:
  • Snow through: 2016-2017 season

Met

Met 2016

  • All fixed prior to start of this page... I'll go back and add notes as time allows.
  • But, station put up in early April 2016 as a temporary setup on a

Met 2017

  • all good / corrected... same as above, I will add notes later.

Met 2018

  • Barometric Pressure good through 6/2018 visit
  • Wind Speed & Direction good through 6/2018 visit
  • Air Temperature / Dewpoint / Relative Humidity good through 6/2018 visit
  • Rain Gage destroyed by moose 12/25/2017.
    • Bucket fixed 6/13/2018 around 21:00 - 22:00 (tips in data were test tips with new bucket).
    • QA file reflects this.

Radiation

Radiation 2016

  • all good / corrected

Radiation 2017

  • all good / corrected

Radiation 2018

  • SW & LW & Skin Temp look good through 6/2018 visit.

Soil

  • I need to dig into the fieldbook notes to see if the VATP jacked at all in 2017.

Soil 2016

Soil 2017

  • Heat Flux plates nonworking until 10/2017

Soil 2018

  • 2018 heat flux plates look decent.
    • it could be that top & bottom are flipped and also that what should be the top is actually flipped in sign?...need to compare to top.
  • VATP
    • Blip during station visit at 6/13/2018 21:00

Snow

Snow 2016-2017

Snow 2017-2018

Station History / Site Downloads / visits:

April 10 2016

  • Temporary station built above flood plain. Station put in at end of first snow survey trip of Teller.
  • At that point this was labeled the blue site (the blue electrical tape IDed this site in the logistics phase).
  • Site established around 4/10/2016
    • AT/RH
    • 4 component Radiation
    • Surface water

April 21 - May 5 1 2016

  • Station visited nearly daily during ablation trip

July 2016

  • LC visited and downloaded data.
  • Temporary station had fallen over (knocked by an animal).

August 12 - 22 2016

  • LC & B Busey improve upon site making Teller Bottom site and splitting off the Teller Surface Water Station.
  • Wind Speed / Direction added
  • W