SS To Do Next Visit

From IARC 207 Wiki
Jump to navigation Jump to search

Publications List

2021

  • Check 6m AT/RH wiring.
    • I think we replaced it in March 2021 but it is still acting up so likely to be a cabling issue again.

Program Change

  • change ss_soil soil moisture to period averaging method to reduce overranging
  • add leaf wetness sensor to geonor again?
  • change sdi12 instruction for ss_ff_rad snow to output quality number... looks to be zero.

May 2021 Datapro remainder Items

  • ss_geonor -- need to add charger key file etc
  • ss_soil_2 -- need to add sm_profile.dat and snow.dat to automated processing.
  • ss_ff_rad -- need to add snow to automated processing.

2019

    • bring out MD485 to tie in to network out there

May 2019

  • check sr50a #2 maybe not working according to data.

2018

Fall List

  • Photograph tag & equipment for:
    • LICOR units (tower & forest)
      • Property Tag 36113 (I think this may be Y Kim)
      • Property Tag 36114 (I think this may be Y Kim)
    • 3 CR1000s
      • Property Tag 36104
      • Property Tag 36106
      • Property Tag 36117
  • Might add a SR50A to the soil pit
  • might add a SI111 to the soil pit
  • might add a UPS for the heat flux logger system in case there are power problems
    • the network switch connecting the toughbook to the LI7200 and the LI7200 to the fluxprocessor
  • Need to find out OS version of tower wind master pro
  • need to remove battery from sky cam laptop
  • bring out NL100/200.
  • error message associated with heat flux memory card... replace memory card.
  • order a LiCor network cable for forest floor.

Summer List

Ss soil has room on c5 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.

  • C5 -- SDI12 ID 8 = Shed
  • C7 -- SDI12 ID 9 = Forest Floor Radiation Stand

Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.

  • Replace SR50A transducers
  • Dig second pit for soil instruments
  • clean up outdoor power cords
  • waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
  • I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
  • connect those shop power strips and get one more for inside?
  • buy and add more PAR top and bottom (4x and matching hardware)
  • add another tipping bucket.
  • bring solder out for ff atrh blower and electrical goo