Tripod setup

From IARC 207 Wiki
Revision as of 19:54, 23 March 2011 by 137.229.92.225 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Tools:

  • Circular Saw
    • 2x12 trim
    • 1x12 trim
  • Sawzall
    • Pipe to size
    • unistrut to size
  • cordless Screwdriver
    • CSI gear onto 1x12
    • Hinges onto 2x12
    • Brackets onto 2x12
    • solar panel onto actionpacker
  • Metal File
    • Trim up cuts to pipe & unistrut
  • measuring tape

The Plan

  1. Cut the 8' 2x12s to 6'
  2. Screw the 2x12s to the heavy 10" angled bracket
  3. Place the actionpacker in the crook of the 2x12 L and screw it to the L with screws and fender washers
  4. screw the hinges to the 2x12
  5. bolt the unistrut legs to the hinges
  6. bolt the unistrut cross-piece to the unistrut legs
  7. bolt the unistrut angles to the each leg
  8. screw the unistrut angle to the 2x12 with fender washer, too
  9. hoseclamp the AT pipe to the unistrut cross-piece
  10. Screw the clear tote to the 1x12 with fender washers
  11. screw the instrumentation inside the tote to the 1x12
  12. wire up the instrumentation
  13. mount the solar panel to the actionpacker door... or, mount it to the unistrut cross-arm