NGEE September 3 2012 Trip
Revision as of 15:26, 22 August 2012 by 137.229.92.251 (talk)
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
 - First Program: https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1
 
Pre-trip to do
- Test out program more extensively
 
Things to buy
- Bit o' Food?
 - buy additional required hardware
 - brown tarps
 - solar panel mounts
 - wiring stuff (to control all the excess wires) Action Packers?
 - conduit, lots!
 - large pvc and fittings to go between action packer and CSI enclosure?
 - fittings for an additional opening in bottom of enclosures
 
Stuff to bring out
Extras from Bill
- 4 pcs 107 Probes & Radiation Shields
 
Other
Equipment To Ship
- 4 Tripods
 - 4 Battery Boxes
 - 4 Solar Panels
 - Thermistor Strings
 - Additional Thermistors
 - Radiation Shields
 - Instrument boxes with loggers etc. installed
 - charge controllers
 
Technical Gear
- Shotgun
 - Keypad
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Climbing Gear Proper
 - Serial Cables & spares
 - brown tarps
 - Sawzall
 - drill
 
Food to bring out
- Optional
 
Probable Luggage
- Shotgun [Bob #1]
 - Bob Personal backpack [Bob #2]
 - Work Actionpacker #1 [Bob #3]