Umiat Crew Trip To Do 2013
Revision as of 11:19, 23 May 2013 by 72.5.104.26 (talk)
Contents
Met Sites and Repeaters
DBM1 Accomplishment Creek
- Lat: 68 24.696, Lon: -148 8.190, Elev: 1474.065 meters (4833 feet)
- Telemetry Problem?
- Battery was fine as of 4/28/2013 (last received communication date):
- Data
- Web Page
DUR6 Itmalakpak
- Lat: 68 18.383, Lon: -151 7.468, Elev: 1452 meters (4764 feet)
- Shovel out solar panel.
- Replace barometric pressure if time permits.
- Need a new e-fence charger.
- The lower line is not working but the top line is working.
- Data
- [Web Page
- Web Cam
DUM3 Nanushuk
- Lat: 68 43.243, Lon: -150 30.212, Elev: 541 meters (1774 feet)
- Stakes needed to pin down efence charger
DUM4 Tuluga Met
- Potential bear damage at station.
- Have not heard from station since late September.
- Need an E-Fence; Also new stand?:
- is sitting on the ground surface next to the southwestern fencepost - to the south of the raingauge, the mount is broken and the solar panel/battery is not working
- New Gieck Base & Alter Shield
- Level Precip Bucket
DUM5 Encampment Met
- Bear Fence Needs Repair
DUM6 White Lake Met
- Tighten wiring on Air temp backup (GWS style)
DUM7 Hat Box Mesa
- Put Conduit over Soil thermistor cable
DFM2 White Hills Met
- Needs major sensor repairs. Most of the sensors are bad.
- Would be good to get rainfall and air temperature but I propose probably not fixing the following broken sensors:
- needs a new anemometer (bad bearings),
- has a bad SR50 snow depth sensor old style
- Needs an HMP Air temp sensor or a new backup sensor
DFM4 Northwest Kuparuk Met
- Check radiation shields, are sensors in the shield?
- Replace SR50 old style.
- Fence was in very poor shape on last trip to station.
Surface Water Stations
Lower Itkillik Station
Plant Cam: Installed 2013-05-23- Needs freewave radio
- Needs new program loaded into logger for water levels, turbidity, should be identical to Upper Itkillik except for no cameras.
- Station has:
- HMP,
- 10KOhm resistor
- Battery box thermistor.
- Rig job radio set up: Left pins 2, 3, 5 plugged into Ken's serial connector deal and unplugged 1, 4, 6. Taped back up.
- Plugged in null modem to logger and unplugged power to logger for winter.
- Bad radio or bad connection.
- Snow Survey
DUS3 Chandler Bluff Met
- Leaning tower due to erosion problems.
- Measure the leaning SR50 snow depth sensor distance to snow surface and snow depth so we can possibly correct the bad data due to the leaning tower.
- Move mast onto new tripod base and patch up station best you can.
- Remeasure SR50 distances, etc.
Chandler Crossing
- Install Plant Cam
Chandler Gaging Site
- Install Hobo for backup
- Install PTs
- Record S/N
- SDI Address
- PSI Rating
- Survey in Benchmarks & TBMs
- Snow Survey
DUS2 Anaktuvuk River
- Needs new soil thermistor string
- Needs new Gieck Base and alter shield
- Fix Cameras
- Bring Extra Cable & Camera to the site
- Mount GoPro to Tent frame
- Snow Survey
Needed from Toolik
- Stakes for DUM efence charger
- CC640 Power Plugs (6 conductor deals)
- Some Conduit
Needed from Umiat
- BLM flight schedule
- Return Plant Cams to Fairbanks (2 units)