Super Site Tower

From IARC 207 Wiki
Revision as of 17:23, 1 September 2016 by 137.229.18.212 (talk)
Jump to navigation Jump to search

To Purchase in town etc

  • 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips
  • 4 x 8 x 8, 2 pcs for base

Tools needed

  • small wire snipper
  • flat head screw driver (medium sized)
  • cable ties
  • crimping tool
  • wire trimmer
  • measuring tape

Extra Notes

  • the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
  • something to keep an eye on. It coincided perhaps with an 8/21 visit.
  • it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
  • probably need an extension to reconnect the HMP power.

Activity Log

  • 8/29
    • re-routed all radiation sensors & temporary rewire
    • powered off AT/RH
    • the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
  • 9/1
    • re-routed at/rh
    • hauled out bulk of tower clamps & related hardware