Ribdon River met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed
  • fix solar panel problem

site logs

10 June 2007, Ken I., Dan R.

  • installed HMP45C-L45', s/n Z4750068
    • (could be replaced with sensor with 5-foot cable...)
  • installed GW-YSI 3-AT sensor, tag# ATB5_DAR2
  • installed flex conduit on all wires
  • bridged solar shields (2) w/ copper rod (available mat'ls :) to try to strengthen setup. Both had been bent down & back before we got to site.
  • installed electric fence