Teller Upper Station
Revision as of 22:31, 2 August 2016 by 66.230.110.177 (talk) (Created page with "'''Tape Color is Yellow''' ===Inventory=== * Use Aluminum tripod from Museum * Need to replace some bolts... take care of this 8/3 (Aisle was closed at Home Depot) ** See clip...")
Tape Color is Yellow
Inventory
- Use Aluminum tripod from Museum
- Need to replace some bolts... take care of this 8/3 (Aisle was closed at Home Depot)
- See clipboard for info
- Reuse the 10' x 1" pipe up top used the by the cameras for the net radiometer cross arm
- I think we'll need to have a vertical support partway out the pole to keep it all level.
- could use unistrut for all of this but will need to drill a hole in one of the unistruts because the holes don't entirely line up.
- ubolt horizontal unistrut to tower
- ubolt 1" pipe to horizontal unistrut
- partway out horizontal pipe then add a vertical piece of unistrut.
- Two batteries up top. We'll need to helicopter these up.
- battery box for up top remains in 106 to carry sensors out in second shipment.
- Cross arms:
- Net radiometer
- additional one for AT/RH
- Need to figure out what to do up top for the anemometer...
- 3/4"insert is up there but need to go 3/4" to 1" vertical...
- Complications
- crossarm ubolts from Campbell aren't big enough diameter to go around this pipe.
Anchoring system
Sensors
- 1 Soil pit
- Hydraprobes @ 5 depths
- soil thermal conductivity at 4 depths
- one additional surface temperature
- 1 GIPL VATP (I'm on the fence about the length for this one)
- Met
- HMP155 AT/RH @ 1.5m (already up top)
- Radiation shield too
- RM Young anemometer for up top
- If have enough, a skin temperature sensor (SI-111)
- CNR4 Net Radiometer (already up top)
- TE525MM with cable
- HMP155 AT/RH @ 1.5m (already up top)
- Anything else?
Extras
- Need to measure resistance of heaters for all thermal conductivity sensors
- need to color code all subsurface sensors
- need to make sure extension cords are included for solar panel to charge controller
- same for battery to charge controller
- and again logger to charge controller
- also need fused power and spare fuses
- power jumper cables to put the two batteries in parallel
- Need to drill out hole in battery box for the liquid-tite.
- need to trim back the Vitel cable so that we can wire them up properly
- need to include terminal strips for power, ground, and control of Vitels.
- probably need to figure out if we need additional terminal strips for the thermal conductivity.
To Buy up top:
- 1" unistrut pipe clamp for net radiometer
- may have this in our unistrut stock.
- Anchoring system supplies
- review photos for nome storage stock.