Kougraok M64

From IARC 207 Wiki
Revision as of 14:52, 19 August 2016 by 66.58.163.81 (talk)
Jump to navigation Jump to search

Tape Color is Green

In NGEE Container:

  • Tripod base with green tape.
    • Requires 1.25" schedule 40 pipe mast

In UAF Storage

  • 1" x 3' aluminum pipe, three pieces
  • 2 pipe wrenches
  • large cable ties
  • small cable ties
  • fish tape
  • 4 dog anchors
  • saw
  • grease
  • anti oxidizing grease for electrical connections
  • a bunch of hose clamps (including for precip bucket
  • Bosch drill
  • GIPL drill bit

Sensors in UAF storage

  • Tipping bucket
  • GIPL VATP

To Buy in Nome

  • At Grizzly Hardware pick up a 1.25" schedule 40 pipe threaded on one side

===To buy in Fairbanks

  • 1" topper for tripod past
  • 1" to 1.25" coupler to replace one used at teller top site


Cross arm situation

  • Use short 1" Aluminum pipe for precip stand at site. Have three of these in the UAF Nome storage as well as the brackets required.
  • the hose clamps for the site are in Nome along with some other items.


To ship from Fairbanks

  • 2 pcs 12V batteries


Sensors

  • Met:
    • HMP155AC (@1.5 meters)
      • radiation shield
    • RM Young @ 3meters
    • Barometric Pressure
    • CNR4 for Net Radiation
    • 3 NDVI sensors
    • 3 other radiation sensors
    • skin temperature
  • Soil only applicable if we build at M64 rather than Pilgrim Hot Springs
    • 5 soil moisture
    • 4 thermal conductivity / specific heat
    • GIPL VATP


    • bringing out 2 batteries for this site




Extras

  • Using NGEE tripod in GIPL Upark storage
  • Need cross arm for Net Radiation
  • Still need to put precip stand together for tipping bucket
  • still ned to sort out battery box for here.