Dfm2
Revision as of 10:03, 3 July 2007 by imported>Ken
White Hills met
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
site logs
9 June 2007, Ken I., Dan R.
- old site dismantled for later removal:
- battery box: about 220 pounds, including 3 batteries
- tower/stand: about 100 pounds
- solar panel REMOVED
- electric fence put up using 4 posts