Dfm2

From IARC 207 Wiki
Revision as of 21:08, 10 July 2007 by imported>Ken
Jump to navigation Jump to search

White Hills met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed
  • backhaul old repeater stand & battery box from site (320 pounds total)

site logs

9 June 2007, Ken I., Dan R.

  • old site dismantled for later removal:
    • battery box: about 220 pounds, including 3 batteries
    • tower/stand: about 100 pounds
    • solar panel REMOVED
  • electric fence put up using 4 posts