site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
- take replacement screed stake (4 feet long?) to site
- replace SE anchor with driving head attached; remove/recover driving head
- take 2-1/2-foot unistrut & bolts (see below) for 3rd fencer stand leg
site logs
12 June 2007, Ken I., Doug K.
- installed electric fence with 6 posts, one wire at about 3-1/2 feet height
- tried to drive main tower anchors, but drove driving head onto SE screed stake to stay...
- fence charger cranepod has only 2 unistrut legs; 3rd leg is copper ground rod hose-clamped to hinge hasp;
- TAKE 2-1/2-foot U-strut & 1 inch 1/4 or 5/16- inch bolts to replace leg
- lost new age pliers somewhere near site