2017 NGEE Nome October trip

From IARC 207 Wiki
Jump to navigation Jump to search

Extra notes

  • bring guy wire markers for K64 met station
    • (at uaf storage)


Activities:

  • teller top:
    • double-check data
    • thermal conductivity probes working?
    • maybe replace cnr4
  • teller bottom
    • sr50a transducer replacement, 2x
    • remove 1 PT
    • discharge measurement
  • Kougarok m64

Loose Itinerary

  • 9/29
    • evening: arrive & stay in apartments
  • 9/30
  • Teller Snow pole survey & replacement
    • put gps base at new location at bottom
    • walk the end point of the lines set up in March 2017 and secure the orange poles so they are erect for winter.
  • 10/1
    • Teller button up for winter, snow pole remainder
    • remove one PT at the bottom site
  • 10/2
    • drive to kougarok. download data over radios from K sites
    • stretch goal... visit k2 if time for thaw depth measurements
  • 10/3
    • kougarok m64 winter button up
    • soil pit
    • kougarok m64 finish surveying
  • 10/4
  • Council
    • survey 2017 plots?
    • download data
    • visit C2?
  • 10/5 depart