SS Site Visit 2018-03-22

From IARC 207 Wiki
Revision as of 14:13, 22 March 2018 by 137.229.18.212 (talk) (Created page with "* Clear snow off shed roof * setup dropbox file transfer for forest floor * confirmed file transfer for tower laptop * cleared snow off tower * secured tower LI7200RS on towe...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Clear snow off shed roof
  • setup dropbox file transfer for forest floor
  • confirmed file transfer for tower laptop
  • cleared snow off tower
  • secured tower LI7200RS on tower (had loosened)
  • confirmed both flow modules say 15.0 measured flow
  • SW update on old ss_main toughbook