2018 NGEE Fall Utqiagvik Trip
Revision as of 13:55, 29 September 2018 by 137.229.112.93 (talk)
Fairbanks todo
- pull out necessary tools
- pack gear
- pack daypack
- charge drill
- assemble food & drink
Important Times
- Flight: Alaska 192 Departs: Fairbanks (FAI) on Mon, Oct 1 at 11:00 am
- Sunrise: Oct 2 at 8:50 AM
- Flight: Alaska 50 Departs: Barrow (BRW) on Tue, Oct 2 at 7:09 pm
Utq To Do
- Intensive Site A HMP155 failed (3.5m)
- Intensive Site B HMP155 failed (1.4m)
- Intensive Site C HMP155 failed
- Have 2-3 additional HMP155 membrane tips
- bringing a bit of electrical tape to seal these things up after sensor replacement
- need to replace the network cable running from the computer to the network switch. It cuts out with minimal bumping...
- I think I almost need to connect the computer to a screen to see where the hang up is if it indeed turned on so I'll bring my light keyboard/mouse and an HDMI to DVI cord.
- Site A SR50A transducers have failed
- Check level of tipping buckets
- Check level of radiometers
- replace radiometer desiccant
- polish radiometer domes
- some subsurface items are beginning to fail.
- label the computer
- bring up the nuc plate and wood screws and other screw packet to mount nuc to wall
- troubleshoot the network connection in control shed.
- take new pictures of inside control shed
To Bring
- Tools
- CSI Phillips for opening CNR4 radiometers and SR50A
- Tap & Die in case any more radiometer screws strip
- torpedo level for tipping bucket level
- 5/16" screw driver for tipping bucket level
- electrical tape for HMP155 replacement
- Antenna & coax for C site to get antenna outside of the box. (two different antennas will decide on which up in Utqiagvik)
- Drill & battery for potential tap & die stuff
On Site
- Should be a ladder at the NGEE Flux tower for use replacing 3.5m instruments