SS Site Visit 2018-07-21
Revision as of 12:10, 21 July 2018 by 137.229.21.10 (talk) (Created page with "* brought out Ameriflux team * Fixed CNR4 top thermistor which I think the connector was cross threaded a bit and as tight as it would go but not actually engaged. Or previou...")
- brought out Ameriflux team
- Fixed CNR4 top thermistor which I think the connector was cross threaded a bit and as tight as it would go but not actually engaged. Or previously engaged and loosened shortly after the reinstallation.
- brought out replacement computer for met data but thinking I won't install until after the experiment is over and power needs are less... or I'll see once everything is all set and then maybe add.
- Extension cord for forest floor tower had fallen out of the wall a bit... plugged it back in.
For to do next visit
- could use several power strips in shed to make sure circuits are more easily balanced.
- Should use those one hole deals plus drill and screws to take a bit of pressure off the extension cords plugged in but hanging outside shed.
- need to bring out red & black wire for the 12v power supplies for the two laptops.
- shift data logger power onto the 12v battery system
- buy more cross arm brackets for additional PAR sensors on top
- bring out new skin surface temperature sensors