- Met Data QA'd through: 6/15/2018
- Radiation Data QA'd through: 6/15/2018
- Soil through:
- Snow profile through:
- Snow through: 2016-2017 season
- Spectral through:
Met
Met 2016
- All fixed prior to start of this page... I'll go back and add notes as time allows.
- But, station put up in early April 2016 as a temporary setup on a
Met 2017
- all good / corrected... same as above, I will add notes later.
Met 2018
- Barometric Pressure good through 6/2018 visit
- Wind Speed & Direction good through 6/2018 visit
- Air Temperature / Dewpoint / Relative Humidity good through 6/2018 visit
- Rain Gage destroyed by moose 12/25/2017.
- Bucket fixed 6/13/2018 around 21:00 - 22:00 (tips in data were test tips with new bucket).
- QA file reflects this.
Radiation
Radiation 2016
- all good / corrected
Radiation 2017
- all good / corrected
Radiation 2018
- SW & LW & Skin Temp look good through 6/2018 visit.
Soil
- I need to dig into the fieldbook notes to see if the VATP jacked at all in 2017.
Soil 2016
Soil 2017
- Heat Flux plates nonworking until 10/2017
Soil 2018
- 2018 heat flux plates look decent.
- it could be that top & bottom are flipped and also that what should be the top is actually flipped in sign?...need to compare to top.
- VATP
- Blip during station visit at 6/13/2018 21:00
Snow
Snow 2016-2017
Snow 2017-2018
Station History / Site Downloads / visits:
September 24 & 26 2018
- B Busey / Bolton / CAS
- memory problem on logger 9/24 but due to food poisoning just downloaded data.
- returned 9/26 and upgraded the OS to latest
- resent program & readdressed.
- I don't yet know the problem here? Error in CF card perhaps? In 2019 I will replace the CF card with another.
June 13 & 15 2018
- Station Maintenance @
- 6/13/2018 20:00 UTC
- 6/15/2018 20:00 UTC
- B Busey & N Wales
- fixed animal damage
- snow sensor knocked over 12/25/2017
- tipping bucket removed probably around then, too.
- fixed program bug
April 10 2016
- Temporary station built above flood plain. Station put in at end of first snow survey trip of Teller.
- At that point this was labeled the blue site (the blue electrical tape IDed this site in the logistics phase).
- Site established around 4/10/2016
- AT/RH
- 4 component Radiation
- Surface water
April 21 - May 5 1 2016
- Station visited nearly daily during ablation trip
July 2016
- LC visited and downloaded data.
- Temporary station had fallen over (knocked by an animal).
August 12 - 22 2016
- LC & B Busey improve upon site making Teller Bottom site and splitting off the Teller Surface Water Station.
- Wind Speed / Direction added
- W