Super Site CNR4 Recalibration procedure
Jump to navigation
Jump to search
Contents
Tools
- Small channel lock
- camera / cellphone camera
- optional: cloth or towel to catch small screws and to keep the glass protected
- bubble level
- 1/2" Nut Driver
- 1/2" box wrench
- 5/16" nut driver
Tower Instrument Process in field
- bring the tools to the top of the tower
- bring the replacement instrument to the top of the tower
Forest Floor Instrument Process in field
Process out of field
- Submit PR to Ott-Hydromet and guess on shipping price
- Contact company for RMA number, fill out printable declarations and ship.
- Box up and send via UPS with RMA info on inside and outside of box.