Umiat May 2010 Field Trip
Contents
Umiat May 2010 Logistics
This website helps me organize everything that needs to get done for the Umiat logistics May 2010.
(EKY Last Update 4/12/10)
Schedule
- April 12-17 Umiat Runway Plowed by UIC
- May 8-9 DOT plow runway?
- May 8-12 Richard to Umiat Daily BLM flights to Umiat, 1 UAF camp supplies flight 1 UAF staff flight 1 UAF equipment/gear flight?
- May 9-11 Horst Camp to Umiat 2 flights mobilization
- May 11 or 12 UAF crew & Horst camp to Umiat (1 or 2 flights? Gear weight)
- May 19 Ken to Umiat, Bob to Prudhoe (Dave B. to Umiat w/ BLM). Resupply Horst camp.
- June 3 UAF crew + cook departs Umiat, Horst group arrives for camp tear down
- June 5 2 flights for Horst crew demob to Fairbanks
Logistics To DO
- Book Wright Air Flights
- Assist with permitting for Horst Camp
- UIC Quote - Bill
- Horst camp weights
- UAF equip weights
To DO for Field Prep
- Test ADCPs in river
- River Surveyor ADCP/GPS set up and testing in river
- Novatel GPS configuration files
- Trimble memory upgrade and battery cable
- Configure HOBO meters
- Survival kits put together
- Manuals/Guidance
Equipment/Supplies to Send to Umiat
- 1 drum unleaded fuel for boat motor and misc. use
- Spare Aquistar PTs
- HOBO PTs + data reader
- Wall tent supplies @ red door
- 3- 12V 100 a-h batteries (ADCP, Trimble GPS, spare)
- battery charger
- Trimble GPS and tripod
- ADCP Rio Grande
- ADCP River Surveyor
- Novatel GPS and wiring harnesses, config files
- Big Toughbook
- 2 radios
- 2 GPS tripods
- spare drybags
- life jackets (2 to Itkillik, 2 to Chandler)
- printer
- Disc weights for PTs
- Hose clamps
- sledgehammers
- rebar drive head
- level, survey tripod, rod
- backup hardrives
- flow tracker, rod, manuals
- binoculars
- laser rangefinder
- helo helmets
- Satellite phones (2)
- Shotguns + ammo (2)
- spare boat & motor parts
- survival/safety bags
- misc. stream gauging parts
- Manuals/Guidance