Toolik DOT 2011-05-17

From IARC 207 Wiki
Revision as of 15:50, 16 May 2011 by 137.229.91.159 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Tasks

Itkillik

Helo Flight one -- Nathan & Bob

  • Download GPS Data & Restart logging
    • TSCe
  • Wire in PT?
    • CSI Screwdriver
  • Pictures @ Bridge crossing
    • Digital Camera
  • Get pictures restarted for View A
To Bring
  • second PT
  • PT weight
  • bring out another screed stake or two for this PT
  • computer & keyboard
  • TSCe


Helo Flight two -- Bill

  • Bring more gear out

Nathan & Bill

  • Survey
  • Install PT
  • Install second Hobo
  • Snow survey
  • Alternate sat phone

Later in day (All three?)

  • Locate gaging spot for peak flow

Stuff at Itkillik for UMC & Itikmalakpak

  • sawzall & blade
  • backup hand saw
  • flange plate & hardware

Helo Flight three -- Bob

Bob will take emergency sat phone and visit the high met sites:

Upper May Creek

  • Tipping Bucket / windshield replacement
    • shields are currently in helicopter
    • hoseclamps & screws are in a ziploc with a green bottom @ Itkillik
  1. clear snow from ground surface
  2. place wooden cross pieces on the ground
  3. screw the flanges to the wooden cross pieces
  4. twist the altershield vertical members into the flanges
  5. hang the alter shield
  6. cut the precip pipe so precip bucket comes to within 1/2" to 1" below altershield
  7. hoseclamp precip bucket to center pipe
  • download camera images

Itikmalakpak

  • Tipping Bucket / windshield replacement
  • download camera images

Tools

  • Bob's toolbags
  • cordless drill to screw precip deals in place
  • sawzall to cut precip pipe to length
  • serial cable

Things to do yet in Toolik

  • Update firmware on streampro
  • Follow up on Ken's email about other station work

Things to do on another day at the Itkillik

  • Put together the back up Hobo and install just downstream of the gaging site
  • Survey in the water level locations
  • Make a GPS Master 3 near the down riverest hobo once it's installed.