SS June/Jul 2011 Trip 1
Revision as of 15:00, 29 June 2011 by 137.229.92.225 (talk)
Combo with CPCRW trip maybe. In Fairbanks
- Add 2 AT/RH to measurements and outputs.
- Drill holes for ubolts
Fieldwork
- Finish Anchors
- Wire AT/RH
- send program to met logger
Computerwork
- change scp in camera scripts to rsync
- rsync -avz -e "ssh -p 22 -i ~/.ssh/rsync-key" /local_image_dir/ pfss@main_server.iarc.uaf.edu:/remote_destination/
- set computer up to restart nightly so this wireless disconnection stops being a bother.
- 50 1 * * * (shutdown -r now)
- log temperatures and wireless signal strength, refresh brain on what I have set up up there
CPCRW Trip:
- Download data from all four sites
- bring out solder and soldering iron to patch up chopped up wires
- electrical tape
- net radiometers
- anemometers