NGEE September 3 2012 Trip
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
- First Program (not including thermal offsets which will be added onsite):
Metadata type stuff
- NGEE-Barrow Calibration and Serial Numbers
- Timezone - UTC
- PakBus IDs - A = 400; B = 401; C = 402; D = 403
Supplies / Equipment the GIPL is providing to the project that will need to be replaced
- 4 Tripods
- 4 CrossArms
- 4 Radiation Shields
- 4 107 Temperature Probes
- 24 Thermal Conductivity sensors from East30
- 8 Current Excitation Modules
- 8 AM16/32 Multiplexers
- 4 CR1000s
- Instrument box
- charge controller
Supplies / Equipment IARC is providing to the project that will need to be replaced
- Radios?
- set hopping channels to an alternate
- set up in multipoint mode
- Power Cables?
Enroute
- Battery Boxes should arrive 8/30ish
- batteries I'm not sure of but should arrive near our departure.
Program to do yet
- seasonal snow measurements... not going to do anything special I think.
- test final program... testing.
Pre-trip to do
- Cut Pipe
- Ship stuff: thinking two loads
- shipment 1 ship Wednesday and that will be stuff we'll need on arrival
- shipment 2 ship Friday and that will be things still being prepped early next week.
- Organize per site items
- Precip Stand
- 3 screed stakes
- Pipe: 2 pcs 5 ft; 1 pcs 2.5'
- Hose Clamps (2 sizes)
- NuRail fittings (currently in Bob's office)
- Tripod Related
- 1 pcs tripod
- 1 pcs instrument box & contents:
- cable ties
- AM16/32s
- 2 pcs current excitation module
- 1 pcs CR1000
- 1 pcs radio & power cable
- 1 pcs radio antenna setup
- 1 pcs null modem
- Energy system
- 1 pcs solar panel
- 2 pcs ubolts for solar panel mount
- 2 pcs aluminum strips for solar panel mount
- 4 pcs nuts & bolts for solar panel mount
- Batteries if they arrive
- Ring connectors for batteries
- power cable to go between batteries
- power cable to go battery box to instrument box
- cable protection between battery box and instrument box
- power cable to go between solar panel and battery box
- cable protection to go between solar panel and battery box
- cold temperature power cable (red & black or an all-weather extension cord)
- 1 pcs power cable from solar panel
- 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
- 1 pcs charge controller
- 1 pcs SR50A setup
- 5' x 3/4" Pipe
- SR50A setup
- 1 pcs SR50A
- 1 pcs SR50A mount
- 1 pcs SR50A cable
- 1 pcs SR50A cable protection
- Air Temperature Setup
- 1 pcs AT radiation shield
- 1 pcs 107 Temperature Probe
- 1 pcs cable protection
- Subsurface Hardware
- 9 HydraProbe IIs
- 3 HFP01 heat flux plates
- 5 deep thermistor probes
- 1 shallow thermistor probes
- 9 thermistors probes to pair with the hydraprobe iis
- 6 thermal conductivity probes to put two of the pits
- Precip Stand
Things to buy
- Bit o' Food?
- buy additional required hardware
- 2400 ft of 3/4" flex conduit
- 100 ft of 3/8" flex conduit
- brown tarps
- solar panel mounts
- wiring stuff (to control all the excess wires) Action Packers?
- conduit, lots!
- large pvc and fittings to go between action packer and CSI enclosure?
- fittings for an additional opening in bottom of enclosures
- cable ties
Stuff to bring out
Extras from Bill
- 4 pcs 107 Probes & Radiation Shields
Other
things not on a PR yet
- power cables (reds & blacks or extension cords)
- cable protection for energy system
- brown tarps from Freddies
- NRS straps maybe from the Beave for the tarp.
- Cable Ties
Equipment To Ship
- 4 Tripods
- 4 Battery Boxes
- 4 Solar Panels
- Thermistor Strings
- Additional Thermistors
- Radiation Shields
- Instrument boxes with loggers etc. installed
- charge controllers
Technical Gear
- Shotgun
- Keypad
- fish tape
- kayak
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Climbing Gear Proper
- Serial Cables & spares
- brown tarps
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
How it will go down out there
- Bil & Vlad drill the thermistor bore holes
- Bob focuses on the wiring and station set up with an assist as needed from others
- Anna if she comes digs and logs soil pits
- All will share hauling duties from truck to intensive site area