NGEE Barrow Intensive Sites Initial Wiring

From IARC 207 Wiki
Revision as of 15:17, 22 August 2012 by 137.229.92.251 (talk)
Jump to navigation Jump to search
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
'''  FALL SENSOR LIST   '''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
' 3 -- HFP01 Heat Flux Plates
' 9 -- Vitel HydraProbe II Probes
' 9 -- East30 Sensors Thermal Conductivity Probes [Not yet added]
' 5 -- 16 point thermistor strings
' 9 -- thermistors to be installed adjacent to the soil moisture probes
' 1 -- 5 point shallow borehole 
' 1 -- 107 Air Temperature
' 1 or 2 -- SR50A Snow Depth
' 3 -- HFP01 Heat Flux Sensors

'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
'''  LOGGER WIRING   ''''''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''

' SE1  -- HFP01 #1 HI (White Wire)
' SE2  -- HFP01 #1 LO (Green Wire)
' SE3  -- HFP01 #2 HI (White Wire)
' SE4  -- HFP01 #2 LO (Green Wire)
' SE5  -- HFP01 #3 HI (White Wire)
' SE6  -- HFP01 #3 LO (Green Wire)
' SE7  --
' SE8  -- 107 Probe Signal (Red Wire)
' SE9  -- 
' SE10 --
' SE11 -- 
' SE12 -- 
' SE13 -- AM16/32B #1 COM ODD HI, Precision Resistor to VX2
' SE14 -- AM16/32B #1 COM ODD LO, Precision Resistor to VX2
' SE15 -- AM16/32B #2 COM ODD HI, Precision Resistor to VX3
' SE16 -- AM16/32B #2 COM ODD LO, Precision Resistor to VX3

' VX1 -- 107 Probe Excitation (Black Wire)
' VX2 -- Precision resistors to Mux 2 COM ODD HI, SE1, COM ODD LO, SE2
' VX3 -- Precision resistors to Mux 3 COM ODD HI, SE1, COM ODD LO, SE2

' P1 -- 
' P2 -- 

' C1 -- AM16/32B #1 & 2 -- CLK
' C2 -- AM16/32B #1 -- RES
' C3 -- AM16/32B #2 -- RES
' C4 -- 
' C5 -- SDI 12 Devices Part 1 (9 Vitel Probes )
' C6 -- Vitel Probe CONTROL
' C7 -- SDI 12 Devices Part 2 (1 or 2 SR50A ) (Green Wire)
' C8 -- 
' SW12V -- Radio Power

' Signal Ground -- HFP01 Shields (Clear Wire), 107 Probe SG (Purple Wire), SR50A 
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
''   Sensor Wiring   ''''''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''
' 107 Probe
' Black Wire -- CR1000 VX1
' Red Wire  -- CR1000 SE8
' Purple Wire -- CR1000 Signal Ground
' Clear Wire -- CR1000 Signal Ground

' HFP01
' White Wire -- CR1000 SE1, 3, or 5
' Green Wire -- CR1000 SE2, 4, or 6
' Clear Wire -- CR1000 Signal Ground

' SR50A
' Black Wire -- CR1000 Power Ground
' Red Wire -- CR1000 +12V
' Green Wire -- CR1000 C7
' White Wire -- CR1000 Ground
' Clear Wire -- CR1000 Ground

' HydraProbe II
' Red Wire -- CR1000 +12V
' Black Wire -- CR1000 Ground
' Blue Wire -- CR1000 C5