NGEE Barrow 2013 Site Install Trip

From IARC 207 Wiki
Revision as of 15:37, 29 April 2013 by 137.229.92.251 (talk)
Jump to navigation Jump to search

May 2013 Trip

Purpose:

  • Fix Grid Site station
  • Snow Surveys
  • Any other prep that's possible


Shipping

To Do as of 4/21/2013

  • Modify Programs
  • Wiring Diagrams
  • PRs for freight
  • Sketch up site
  • cut crossarms to length
  • Change SDI-12 IDs for SR50As
  • Review Site C data... Look closely at SR50A data for precise failure dates.
    • Reinforce grounding
  • SM Grid rewiring?


Remaining things to grab

  •  ?

To Purchase

  •  ?

Pre-trip to do

Things to buy

  • Bit o' Food?
  •  ?

Stuff to bring

  • Adirondack Tube
  • Scale
  • Thaw Probe
  • Ziplocs
  • GPS
  • If NuRail fittings ever arrive then we can change out the tripod poles (or start) this trip.

things not on a PR yet

Technical Gear

  • Shotgun
  • Keypads
  • fish tape
  • Tool Bags
  • Computer & (packed) SC32B
  • Climbing harness
  • Serial Cables & spares
  • Sawzall
  • drill

Food to bring out

  • Optional

Probable Luggage

  1. Shotgun [Bob #1]
  2. Bob Personal backpack [Bob #2]
  3. Work Actionpacker #1 [Bob #3]

Rough on-site todo

  1. Copy wiring of Grid Site
  2. Transfer wires to new multiplexer & Logger
  3. Snowsurveys