NGEE Barrow 2013 Site Install Trip
Revision as of 15:37, 29 April 2013 by 137.229.92.251 (talk)
Contents
May 2013 Trip
Purpose:
- Fix Grid Site station
 - Snow Surveys
 - Any other prep that's possible
 
Shipping
To Do as of 4/21/2013
- Modify Programs
 - Wiring Diagrams
 - PRs for freight
 - Sketch up site
 - cut crossarms to length
 - Change SDI-12 IDs for SR50As
 - Review Site C data... Look closely at SR50A data for precise failure dates.
- Reinforce grounding
 
 - SM Grid rewiring?
 
Remaining things to grab
- ?
 
To Purchase
- ?
 
Pre-trip to do
Things to buy
- Bit o' Food?
 - ?
 
Stuff to bring
- Adirondack Tube
 - Scale
 - Thaw Probe
 - Ziplocs
 - GPS
 - If NuRail fittings ever arrive then we can change out the tripod poles (or start) this trip.
 
things not on a PR yet
Technical Gear
- Shotgun
 - Keypads
 - fish tape
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Serial Cables & spares
 - Sawzall
 - drill
 
Food to bring out
- Optional
 
Probable Luggage
- Shotgun [Bob #1]
 - Bob Personal backpack [Bob #2]
 - Work Actionpacker #1 [Bob #3]
 
Rough on-site todo
- Copy wiring of Grid Site
 - Transfer wires to new multiplexer & Logger
 - Snowsurveys