Umiat Crew 2013-05-24

From IARC 207 Wiki
Revision as of 06:44, 24 May 2013 by 72.5.104.26 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Planned:

  • First flight takes Bob & Kevin to the Lower Itkillik
    • Snow course set up and surveys done at the Lower Itkillik
    • Look at radio cable
    • check out stuff drop from Toolik
    • Stay on site a few hours
    • Plant Cam Setup (if not done by Nathan)
  • Second flight takes Erica and Rob to the Chandler
    • Set up the snow course & do a snow survey
    • Dig out a culvert and pull a battery
    • Plant Cam Setup
  • Erica & Rob fly to the Anaktuvuk
    • Do a snow survey
    • Send the helicopter back for Bob & Kevin
    • Dig out the culvert
    • Start Surveying in TBMs etc
    • Bob works on the cameras