NGEE Barrow 2013 Site D Install Trip August 2013
Revision as of 13:50, 9 July 2013 by 137.229.92.251 (talk)
Goals:
- Install Site D
 - Soil Cores
 
Soil Core component: 8 Bob, Bob, & Sammy
- Use RTK GPS and transect across a polygon in the area south
 - pull a
 
Site D Install
Itinerary:
8/19 Bill, Vlad, Bob Busey & Sammy fly to Barrow
8/22 or 23 - Bob Bolton flies out.
- Pick up gear and get ready to haul it out:
- tower
 - batteries
 - battery box
 - solar panel
 
 - sledge tower feet
 - haul stuff out by wheel barrow
 - instrumentation
- 2
 
 
Additional Maintenance:
- Self-tapping screws for precip lids
 - proper pipe for snow stands from 2012 install
 - replace transducers in SR50As -- 7 pcs
 - duct seal remaining holes in the enclosures
 
To purchase:
- Solar Panel
 - Charge controller?
 - Additional CSI stuff
- SR50A transducers
 - cross arm brackets
 
 - 1 inch aluminum cross arm (for Bill stock and D site)
 - duct seal
 - Fresh Desiccant for all sites
 
To Prep:
- wire up data logger box
 
Bring Survey GPS north
- emailed for a quote on R8 internal radio tuned to 418 MHz.