NGEE Barrow 2013 Site D Install Trip August 2013
Revision as of 13:43, 12 July 2013 by 137.229.92.251 (talk)
Goals:
- Install Barrow Site D Inventory
- Soil Cores
Soil Core component: 8 Bob, Bob, & Sammy
- Use RTK GPS and transect across a polygon in the area south
- pull a
Site D Install
Itinerary:
8/19 Bill, Vlad, Bob Busey & Sammy fly to Barrow
8/22 or 23 - Bob Bolton flies out.
- Pick up gear and get ready to haul it out:
- tower
- batteries
- battery box
- solar panel
- sledge tower feet
- haul stuff out by wheel barrow
- instrumentation
- 2
Additional Maintenance:
- Self-tapping screws for precip lids
- proper pipe for snow stands from 2012 install
- replace transducers in SR50As -- 7 pcs
- duct seal remaining holes in the enclosures
To purchase:
- Solar Panel
- Charge controller?
- Additional CSI stuff
- SR50A transducers
- cross arm brackets
- 1 inch aluminum cross arm (for Bill stock and D site)
- duct seal
- Fresh Desiccant for all sites
To Prep:
- wire up data logger box
Bring Survey GPS north
- emailed for a quote on R8 internal radio tuned to 418 MHz.