August 2014 Barrow
Revision as of 15:57, 15 August 2014 by 137.229.92.251 (talk)
To Do:
- Change out snow transducers, 8 pieces
 - swap back the B site net radiometer
 - change out desiccant in the D site radiometer
 - level radiometers
 - Fix C site Rim Snow Sensor
 - D Thermal Conductivity
- Program works fine in Fairbanks
 - Data Points From April Trip:
- Heater Resistance #1 -- 68.2 ohms
 - Heater Resistance #2 -- 70.2 ohms
 - Heater Resistance #3 -- 70.4 ohms
 - Heater Resistance #4 -- 70.7 ohms
 - Heater Resistance #5 -- 69.1 ohms
 - Heater Resistance #6 -- 70.3 ohms
 - Thermal conductivity thermistor resistance #1 -- 57.6 kohms
 - Thermal conductivity thermistor resistance #2 -- 57.8 kohms
 - Thermal conductivity thermistor resistance #3 -- 58.2 kohms
 - Thermal conductivity thermistor resistance #4 -- 57.5 kohms
 - Thermal conductivity thermistor resistance #5 -- 58.0 kohms
 - Thermal conductivity thermistor resistance #6 -- 58.4 kohms
 
 
 - OKAY... Look at how it is wired in the field. / in pictures. I think there are two pulse port instructions when there should be just one but I don't know for sure until I review the photos / see it in person.
 - Basically there are two
 
To Bring:
- Two CNR4 Net Radiometers
- One for B and one for D (or.... retap the D radiometer up there... might try that first.)