August 2014 Barrow
Revision as of 21:58, 20 August 2014 by 64.145.76.81 (talk)
To Do:
- Change out snow transducers, 8 pieces
 - swap back the B site net radiometer
 - change out desiccant in the D site radiometer
 - level radiometers
 - Fix C site Rim Snow Sensor
 - D Thermal Conductivity
- Program works fine in Fairbanks
 - OKAY... Look at how it is wired in the field. / in pictures. I think there are two pulse port instructions when there should be just one.
 
 
To Bring:
- CNR4 Net Radiometers
- One for B (the original)
 - retap the D screws and if I can't get that to work then move the alternate radiometer from inventory (B) to D.
 
 
Plan:
Code: FDVIBG
Depart Thursday morning @ 7:40am
Return Friday night @ 12:21 AM
Thursday
- @ airport by 6ish
 - grab coke in Fairbanks airport
 - Arrive at NARL around 11am
 - get keys and dress for day in field
- wind breaker
 - backpack ready to go
 - lunch for the day
 - Water bottle, fill it
 - actionpacker with:
- 8 snow sensors
 - toolbag
 - net radiometer for B
 - drill for tapping D radiometer if needed
 - 6/32 screw for D
 - also bringing a 4/32 screw & tap for backup.
 - serial cable
 
 
 
At each site
- level radiometer
 - level precip bucket
 - look at leveling tower / anemomemters
 - listen to anemometers for bearing problems
 - swap out desiccant in the box
 - might double-check serial numbers if there is time
 - more pictures
 
Additionally
- At B swap back in original radiometer
 - At C fix the Rim snow sensor
 - At D change out the desiccant in the radiometer