To-do list for next (2015) site visit

From IARC 207 Wiki
Revision as of 16:25, 21 May 2015 by 137.229.92.185 (talk)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Instal evap pan

  • field calibrate - edit program
  • edit program

Wind sensors replacement

  • calculate multiplier for wind direction sensor. for back calculation purposes
  • Replace wind direction sensors

declination: 18.5 degrees todo: edit program

Telemetry

Finish installing radio + ethernet for redundancy

Items to bring up

  • alcohol swabs
  • compass
  • outlet timer for old radio
  • NL100
  • smart phone
  • evap gauge
  • two RM young wind sensors
  • sleeping bag
  • nut driver for tower base

Items to purchase

  • alcohol swabs
  • power strip
  • compass


Tipping tower

working on Tower

  • download CR3000 + radio device config settings
  • alcohol swab 4 radiometers:

Additional tasks

  • alcohol swab 3 radiometers on old tower (net Rad, UVA, UVB)
  • Pluvio

TODO

  • update program
  • program NL100
  • evap gauge base supplies and logistics
  • learn ethernet cable connectors